Custom Home Jargon Buster: A Plain-English Glossary for Comox Valley Home Builders

Previously in our Guide to Building a Home in the Comox Valley, we discussed How to Build an Energy Efficient Home in BC. 

Today, we are looking at ‘Custom Home Jargon Buster: A Plain-English Glossary for Comox Valley Home Builders’.

And while you’re reading, remember the Cameron Custom Home Builders are right here behind you, ready to answer any questions or clarify any part of the process. Just reach out, we want to help.

Building a custom home introduces you to a whole new vocabulary — and nobody warns you about it. One week you’re talking about drainage and the next you’re nodding along to words like “geotechnical,” “draw schedule,” and “lockup” while quietly wondering what any of it means.

This glossary is for you. We’ve compiled the terms that come up most often when building a home in the Comox Valley — from land purchase through to occupancy — and explained them in plain English. Bookmark it. You’ll come back to it.

Land and Planning Terms

Agricultural Land Reserve (ALR): A provincial designation that protects farmland from non-agricultural development. ALR land can only have one primary dwelling and one secondary suite within it. You can’t subdivide it into new lots, and non-farm uses require Agricultural Land Commission (ALC) approval. A significant portion of rural Comox Valley land is in the ALR — always check before purchasing.

Agricultural Land Commission (ALC): The provincial body that regulates the Agricultural Land Reserve. Any application for non-farm use on ALR land goes through the ALC.

Development Cost Charges (DCCs): Fees charged by municipalities or regional districts when a new home is built. They fund the infrastructure — roads, water, parks — needed to support growth. DCCs vary considerably between Courtenay, Comox town, Cumberland, and the CVRD. Budget for these as a soft cost.

Development Permit (DP): A permit required in certain areas before a building permit can be issued. In the Comox Valley, Development Permits may be required for properties near water, eagle or heron nests, steep slopes, riparian areas, or in areas with specific design guidelines. A DP adds a step to the permit process and needs to be factored into your timeline.

Development Permit Area (DPA): A zone designated in a municipality’s Official Community Plan where specific regulations apply to development. Common DPAs in the Comox Valley include floodplain areas, riparian (streamside) areas, eagle and heron habitat, and steep slopes.

Flood Construction Level (FCL): The minimum elevation at which the lowest habitable floor of a building must be constructed in a floodplain area. Determined by a professional engineer’s floodplain report. Required for properties within 100 metres of the sea or certain watercourses.

Floodplain Setback: The minimum distance a building must be set back from the edge of a floodplain or watercourse. Determined by a professional engineer’s report and required before a building permit is issued in affected areas.

Geotechnical Report: A report prepared by a geotechnical engineer that assesses the soil conditions on a lot — bearing capacity, stability, groundwater levels, and any risk factors. Required in many situations in the Comox Valley, particularly on sloped lots or properties with uncertain soil conditions. Informs foundation design.

Official Community Plan (OCP): A long-range planning document adopted by a municipality or regional district that sets out land use policies, designations, and development guidelines. The OCP tells you what an area is planned for over the long term — useful when evaluating land and its surroundings.

Qualified Environmental Professional (QEP): A professional (typically a biologist or ecologist) who assesses environmental conditions on a property. Required for Riparian Areas Protection Regulation (RAPR) assessments and for properties with eagle or heron nest proximity.

Riparian Area: The area adjacent to streams, ditches, lakes, and wetlands. Under BC’s Riparian Areas Protection Regulation, development near these areas requires a QEP assessment to determine the appropriate Streamside Protection and Enhancement Area (SPEA) — a no-build buffer.

Zoning: The set of rules that determines what can be built on a property — what type of dwelling, how large, how many, how far from lot lines. Zoning varies between Courtenay, Comox, Cumberland, and the CVRD, and between different zones within each jurisdiction. Always check zoning before purchasing land.

Design and Architecture Terms

Bearing Wall: A wall that carries structural load from the floors and roof above it. Bearing walls can’t be removed without engineering — a key consideration when modifying floor plans.

Building Envelope: The physical separation between the interior and exterior of a building — walls, roof, windows, doors, and foundation. In coastal BC, the building envelope is critical: it needs to keep water out and allow the structure to dry when moisture does get in. A poorly designed or installed building envelope is the primary cause of rot, mould, and premature deterioration.

Floor Plan: The layout of a home seen from above — the arrangement of rooms, walls, windows, and doors on each level. The floor plan is the most fundamental design decision in a custom home.

Form and Character: A term used in Development Permit areas to describe design guidelines that govern how a building looks — its massing, materials, colours, and relationship to the street. Some areas of the Comox Valley have form and character guidelines that must be followed.

Massing: The overall three-dimensional form and volume of a building — how it sits on its lot, how tall it is, where the bulk of it is concentrated. Massing decisions are made early in design and significantly affect cost and character.

Passive Solar Design: Designing a home to take advantage of the sun’s energy for heating and lighting without active mechanical systems. In the Comox Valley, this typically means positioning living areas on the south side of the home, using appropriate glazing, and designing overhangs that shade in summer and allow low winter sun in.

Rainscreen: A wall assembly technique standard in BC’s wet coastal climate. A small air gap is created between the exterior cladding and the weather-resistant barrier beneath it, allowing any moisture that gets past the cladding to drain out and the wall to dry. Building without a proper rainscreen in this climate is a significant long-term risk.

Setback: The required minimum distance between a building and a property line, road, or other feature (watercourse, eagle nest, etc.). Setbacks are defined by zoning bylaws and other regulations. Understanding the setbacks on a lot tells you how much of it you can actually build on.

Site Plan: A drawing showing the top-down view of a lot — the property boundaries, the proposed building footprint, driveways, setbacks, and utility connections. Required as part of a building permit application.

Construction Terms

Blower Door Test: An airtightness test performed on a completed (or near-completed) home to measure how much air leaks through the building envelope. Required under BC’s Energy Step Code to confirm the home meets the specified airtightness level.

Draw: A payment from your construction mortgage released at a specific milestone in the build. A typical draw schedule has four to five draws, each triggered when the builder demonstrates a defined stage of completion to the lender’s inspector. You pay interest only on the funds that have been drawn.

Energy Advisor: A certified professional who models your home’s energy performance before construction, confirms the design meets BC’s Energy Step Code requirements, and verifies the as-built home at the end of construction. Required for all new homes in BC under the BC Building Code 2024.

Energy Step Code: BC’s progressive energy efficiency standard for new buildings. It establishes levels of performance — from Step 1 to Step 5 — with Step 5 being near-zero energy performance. All new homes in BC must meet at least Step 1; some municipalities require higher steps. An Energy Advisor determines compliance.

Excavation: The digging out of earth to prepare for a foundation. No excavation can begin before a building permit is in hand. Excavation reveals the actual soil conditions on a lot — occasionally producing surprises.

Foundation: The structural base of the home, transferring loads from the structure to the ground. Common foundation types include poured concrete basement, crawlspace, and slab-on-grade. The right type for your site depends on soil conditions, budget, and the design.

Framing: The structural skeleton of a home — walls, floors, and roof built from lumber or engineered wood products. Framing is typically completed in a matter of weeks and transforms a foundation into something that looks like a building. A key milestone and usually the trigger for the second construction draw.

HRV (Heat Recovery Ventilator): A mechanical ventilation system that exchanges stale indoor air for fresh outdoor air while recovering most of the heat from the outgoing air. Required in all new BC homes. Essential for maintaining air quality in a well-sealed, energy-efficient home.

Lockup: The construction stage at which the building is weathertight — exterior walls, roof, windows, and doors are all in place. The home can be “locked up” against the weather. A standard milestone in the draw schedule and the point at which interior rough-in trades begin in earnest.

Occupancy Permit: A permit issued by the local authority once a final inspection has been passed, confirming the home is safe to occupy. In some jurisdictions it’s called a Certificate of Occupancy. You cannot legally move in before this is issued.

Rough-In: The installation of the “hidden” parts of mechanical systems — plumbing pipes, electrical wiring, HVAC ductwork — inside walls and floors before drywall goes up. Rough-in inspections are required before walls are closed. It’s far cheaper to make changes at the rough-in stage than after drywall.

Slab on Grade: A type of foundation where a concrete slab is poured directly on prepared ground, with no basement or crawlspace. Simpler and less expensive than a full basement, but eliminates below-grade storage. A common choice for ranchers and modular homes.

Permits and Regulatory Terms

BC Building Code (BCBC): The provincial standard that governs construction of all new buildings in BC. The current version is BC Building Code 2024, which came fully into force on March 10, 2025. It sets requirements for structure, fire safety, energy performance, airtightness, and more.

BC Housing: The provincial agency that administers the Homeowner Protection Act, including registration of new homes and oversight of the 2-5-10 New Home Warranty. All new homes in BC must be built by a registered builder and enrolled in warranty.

Building Inspector: A municipal or CVRD employee who reviews permit applications and conducts inspections at required stages of construction. Work cannot proceed past each inspection stage until the inspector approves.

Building Permit: The formal approval from the local authority (Courtenay, Comox, Cumberland, or CVRD) that authorises construction to begin. Submitted with architectural drawings, site plan, and engineering documents. No work can begin before the permit is in hand.

2-5-10 New Home Warranty: BC law requires all new homes to be covered by this warranty: two years on materials and labour, five years on the building envelope (the part that matters most in coastal BC), and ten years on structural defects. Your builder must be registered with BC Housing and enrolled in an approved warranty programme.

Financial Terms

Construction Mortgage: A mortgage specifically designed to finance a home that doesn’t exist yet. Funds are released in stages (draws) as construction progresses, rather than as a lump sum. During construction you typically pay interest only on the amount drawn. Also called a progress draw mortgage or builder’s mortgage.

Contingency: A budget reserve set aside for unexpected costs during construction. A 10–15% contingency is standard for a custom home build. Lenders require it and experienced builders will always recommend it. It is not a sign that something will go wrong — it’s insurance for the moments when something unexpected happens.

Hard Costs: The direct cost of construction — labour and materials to actually build the home. Does not include land, design fees, permits, landscaping, or appliances. When a builder quotes a per-square-foot price, they’re usually quoting hard costs only.

Holdback: A portion of each draw payment — typically 10% — retained by the lender until a specified period after completion. The holdback protects against liens from unpaid subcontractors and is released once the builder confirms all trades have been paid.

Lien: A legal claim against a property filed by a contractor or trade who hasn’t been paid for their work. A lien can complicate your ability to sell or refinance a property. Proper holdback procedures protect against this.

Soft Costs: All the project costs that aren’t direct construction — design and engineering fees, permit fees, DCCs, site servicing, Energy Advisor fees, landscaping, appliances, moving costs, and interim housing during the build. Soft costs commonly add 15–25% on top of hard construction costs and are frequently underestimated by first-time builders.

People You’ll Work With

Energy Advisor: See above under Construction Terms.

General Contractor (GC): The primary contractor responsible for managing all aspects of construction — hiring and coordinating subcontractors, ordering materials, scheduling inspections, and delivering the completed home. Your builder is your GC.

Geotechnical Engineer: An engineer who assesses soil and ground conditions. Their report informs foundation design and is required in many situations on Vancouver Island.

Project Manager (PM): The person at your building company responsible for day-to-day site management — coordinating trades, managing the schedule, and communicating progress to the client. On a Cameron build, your PM is your primary point of contact through construction.

Qualified Environmental Professional (QEP): See above under Land and Planning Terms.

ROWP (Registered Onsite Wastewater Practitioner): A licensed professional who designs and assesses private septic systems. Required for any rural lot in the Comox Valley that isn’t connected to municipal sewer.

Structural Engineer: An engineer who designs the structural elements of a building — beams, columns, connections — to meet BC Building Code requirements including seismic standards. Required on all new home construction in BC.

This glossary will be updated as new terms come up. If you hear a word during your build journey that you don’t understand, ask us — the only bad question is the one you didn’t ask.

Get in touch with Cameron Contracting

Ready to Build Your Dreams?

Looking for an experienced, family-orientated custom home builder in the Comox Valley area, who can put a bit of Pizz-azz into your new home? The Cameron team are ready to serve you. For over 40 years, the Cameron’s have been building in the Comox Valley; Built to Last and made to the highest standards. We look forward to meeting you.

If you can imagine it, we’d love to hear about it.