Building permits for your new home in Courtenay Comox

Previously in our Guide to Building a Home in the Comox Valley, we discussed Modular Homes – 10 Important Questions and Considerations. 

Today, we are looking at ‘Building permits for your new home in Courtenay Comox’.

And while you’re reading, remember the Cameron Custom Home Builders are right here behind you, ready to answer any questions or clarify any part of the process. Just reach out, we want to help.

So you’re building a new home, and you need info about permitting. We get asked a ton about permitting, and for sure, it can be an arduous and frustrating process.

But we’ve been working in the trecnches for so long now (+40 years), we’ve dealt with all the headaches, we understand the nuances, we know what the city needs, and we can get the building permit sorted, faster because of this experience.

Here’s how the residential custom-home permit path really works in the Comox Valley’s in the two municipalities. I’ve split it by jurisdiction, then pulled out the gotchas that trip people up.

Town of Comox

What you do first

  1. Confirm zoning and overlays. Check if your lot sits in a Development Permit Area (DP) for riparian, eagles/herons, hazardous slopes, or coastal flood risk. If you’re in one, you’ll need a Development Permit before the building permit. The Town’s DP page explains the DP purposes and lists common environmental DPAs like DPA 7 Riparian and DPA 13 Hazardous Areas. Typical DP processing is 3 to 4 months once a complete submission is in, with riparian DP fees lower than other DPAs. Town of Comox
  2. Check flood requirements early. Comox’s Flood Plain Designation Bylaw sets specific Flood Construction Levels and setbacks by waterbody. If you’re within that mapped influence, your design’s habitable floors and siting will be controlled by those elevations. Town of Comox+1
  3. If you’re disturbing soil or close to storm infrastructure, the Town may require Erosion & Sediment Control and compliance with its Drainage Infrastructure Protection bylaw (they link the forms right on the permit page). Town of Comox

What goes into the building-permit package

The Town publishes a practical “what we need” list for new houses. Highlights:
• Survey and site metrics (average and finished grade, ridge height off average grade, setbacks, floor area and site coverage calcs, driveway location/width, parking counts)
• HPO/BC Housing new-home docs
• Engineered floor system and truss layouts
• Heat source and ventilation details
• Energy Step Code pre-construction documentation from a BC-qualified Energy Advisor
• Geotechnical “appointment” confirmations if applicable
• Plumbing contractor info
That exact checklist sits on their “Get a Building Permit” page. Town of Comox

Energy and airtightness

Comox’s building bylaw hardwires Step Code compliance: pre-construction Energy Compliance Report, mid-construction airtightness testing, and an as-built Energy Compliance Report signed by an Energy Advisor before occupancy. Town of Comox

City of Courtenay

What you do first

  1. Decide if you need a Development Permit. Courtenay recently clarified that single-family homes and duplexes are exempt from form and character DPAs, even in heritage areas. That doesn’t exempt you from hazard or environmental DPAs (e.g., riparian or flood) if your site triggers them—so still screen your lot. City of Courtenay
  2. Expect a pre-application consult for planning files. Courtenay’s Development Procedures Bylaw sets up a pre-application meeting to scope what’s required before you submit formal applications. pub-courtenay.escribemeetings.com
  3. Floodplain and lot grading matter here. Courtenay uses a Floodplain Management Bylaw and a citywide Flood Management Plan. For permits, the City also requires geodetic elevations at the four main building corners on the site plan to confirm grading compliance. City of Courtenay+2City of Courtenay+2
  4. Watch for other city bylaws that may apply to a custom build: Tree Protection, Fill Placement & Soil Removal, Subdivision & Development Servicing (frontage works, service connections), and DCCs. The City clusters all those references on its permits page. City of Courtenay

How you submit and what gets inspected

Courtenay requires digital permit applications. The City lists the inspection sequence in detail—footings, drain tile/damp-proofing, underground services and under-slab, rough-in plumbing, framing (with a site survey due), insulation/vapour barrier, then final with all documentation like Schedule C-Bs, electrical final, and the energy compliance report. Inspections are booked by email with 24-hour notice.

Energy and zero-carbon requirements

Courtenay’s Building Bylaw No. 3114 took effect Jan 1, 2024. The City adopted the Provincial Zero Carbon Step Code and directed staff to build ZCSC performance levels and timelines into Bylaw 3114 (EL2 in 2024, EL3 in 2027, EL4 in 2030). The bylaw also bumps energy efficiency one Step above the provincial minimum for new buildings. Net: plan for Step Code modelling and carbon performance documentation with your Energy Advisor. See City of Courtenay building permits page for more Info

If your lot is outside municipal boundaries

Permits in the rural Electoral Areas are through the CVRD. Current guidance: complete any planning approvals first, then submit your building permit; they publish an anticipated eight-week processing time and a clear checklist, plus fee formulas. The CVRD also flags that BCBC 2024 is in force and references Step Code requirements.

Things that most often slow custom homes here

  • Missing energy package. Both Comox and Courtenay expect Step Code modelling up front and an as-built energy report before occupancy. Line up your Energy Advisor early. Town of Comox
  • Flood and riparian surprises. Final floor elevations, crawlspaces, and even lot grading can be dictated by Flood Construction Levels; work those constraints into schematic design before you fall in love with a layout. Comox Bylaws
  • Geodetic site plans (Courtenay). Plans without corner elevations stall at intake. See City of Courtenay for more info
  • Tree, soil, and erosion permits. Cutting a tree in Courtenay or moving fill can invoke separate bylaws. Comox often wants Erosion & Sediment Control documentation for site disturbance.
  • DP sequencing. In mapped DPAs, your building permit can’t issue until the Development Permit is approved. Budget that into your timeline, especially in Comox where DPs typically take 3 to 4 months once complete. Refer to Comox.ca for more info

Quick start checklist (custom SFD)

For Comox

  • Title & charges, current survey, full zoning summary
  • DP screening; apply for DP if in DPA (riparian, hazardous, etc.)
  • Floodplain check and FCLs
  • Architectural set + engineered floor system + truss layouts
  • Energy Advisor engaged; BC Energy Step Code pre-construction forms
  • HVAC & ventilation specs; site grading, driveway and parking counts
  • Geotech engagement if needed; plumbing contractor details
  • Any Erosion & Sediment Control permit required by the Town

Further reading: See Town of Comox

For Courtenay

  • Digital application with complete drawing set and geodetic corner elevations on the site plan
  • DP screening; confirm any environmental/hazard DP triggers despite SFD being exempt from form-and-character DPAs
  • Floodplain/FCL constraints and lot grading
  • Energy modelling package to meet Step Code and Zero Carbon timelines
  • Inspection plan matching the City’s sequence; line up Schedule letters, energy as-built, electrical final for occupancy City of Courtenay

Sounds like a lot?

If you need support with getting your project approved, the Cameron Contracting Custom Home team can help. Reach out to us to start the conversation.

Continue Reading

Where to go next? Check out the next article in this series, What Does It Cost to Build a Custom Home in the Comox Valley?

Ready to Build Your Dreams?

Looking for an experienced, family-orientated custom home builder in the Comox Valley area, who can put a bit of Pizz-azz into your new home? The Cameron team are ready to serve you. For over 40 years, the Cameron’s have been building in the Comox Valley; Built to Last and made to the highest standards. We look forward to meeting you.